T-314 (arroyo Rd) over Crow Run
PoorPosted for loadElk County, Pennsylvania · 3200FT S LR24002-T314 Int · Structure no. 000000000015762
- Built
- 1960
- 65 years old
- Condition
- Poor
- inspected October 2023
- Type
- Frame
- Concrete
- Length
- 21 ft
- 1 main span
- Daily traffic
- 100
- 2024 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
T-314 (arroyo Rd) over Crow Run is a concrete frame carrying T-314 (arroyo Rd) over Crow Run in Elk County, Pennsylvania. It was built in 1960, so it is 65 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 3 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 100 vehicles a day, roughly 10% of them trucks, projected to reach 106 by 2044. The structure is 21 ft (6.4 m) long and 14 ft wide. If it were closed, the detour would be 13 mi (21 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 3 Serious | Loss of section, deterioration, spalling or scour have seriously affected primary structural components. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was T-314 (arroyo Rd) over Crow Run built?
It was built in 1960, making it 65 years old in 2025.
What condition is T-314 (arroyo Rd) over Crow Run in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in October 2023.
How much traffic does T-314 (arroyo Rd) over Crow Run carry?
About 100 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is T-314 (arroyo Rd) over Crow Run?
The structure is 21 ft (6.4 m) long with a longest span of 21 ft (6.4 m) and a deck 14 ft wide.
Who owns T-314 (arroyo Rd) over Crow Run?
It is owned by the Town or Township Highway Agency.