US Bridges

3rd Street(sr 291) over Chester Creek

Good

Delaware County, Pennsylvania · Just West of RT352 43G05 · Structure no. 000000000043228

Built
1999
26 years old
Condition
Good
inspected June 2022
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
78 ft
1 main span
Daily traffic
13,190
2024 count
Owner
State
State Highway Agency

About this bridge

3rd Street(sr 291) over Chester Creek is a prestressed concrete box beam or girders - multiple carrying 3rd Street(sr 291) over Chester Creek in Delaware County, Pennsylvania. It was built in 1999, so it is 26 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,190 vehicles a day, roughly 15% of them trucks, projected to reach 18,690 by 2032. The structure is 78 ft (23.8 m) long and 85 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

Carries3rd Street(sr 291)
CrossesChester Creek
LocationJust West of RT352 43G05
RouteU.S. Route 13
Coordinates39.84552, -75.36088
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating59 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length78 ft (23.8 m)
Longest span78 ft (23.8 m)
Deck width85 ft (25.9 m)
Roadway width65 ft (19.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,190 (2024)
Projected traffic18,690 by 2032
Trucks15%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 3rd Street(sr 291) over Chester Creek built?

It was built in 1999, making it 26 years old in 2025.

What condition is 3rd Street(sr 291) over Chester Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2022.

How much traffic does 3rd Street(sr 291) over Chester Creek carry?

About 13,190 vehicles per day (2024 count), of which roughly 15% are trucks.

How long is 3rd Street(sr 291) over Chester Creek?

The structure is 78 ft (23.8 m) long with a longest span of 78 ft (23.8 m) and a deck 85 ft wide.

Who owns 3rd Street(sr 291) over Chester Creek?

It is owned by the State Highway Agency.