US Bridges

SR 2011 over Spring Creek

Fair

Dauphin County, Pennsylvania · Hershey · Structure no. 000000000014480

Built
1983
42 years old
Condition
Fair
inspected September 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
52 ft
1 main span
Daily traffic
3,736
2024 count
Owner
State
State Highway Agency

About this bridge

SR 2011 over Spring Creek is a prestressed concrete box beam or girders - multiple carrying SR 2011 over Spring Creek in Dauphin County, Pennsylvania. It was built in 1983, so it is 42 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 3,736 vehicles a day, roughly 5% of them trucks, projected to reach 3,366 by 2032. The structure is 52 ft (15.8 m) long and 32 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesSR 2011
CrossesSpring Creek
LocationHershey
RouteState Highway 0
Coordinates40.28117, -76.67058
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating49.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length52 ft (15.8 m)
Longest span52 ft (15.8 m)
Deck width32 ft (9.8 m)
Roadway width29 ft (8.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,736 (2024)
Projected traffic3,366 by 2032
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 2011 over Spring Creek built?

It was built in 1983, making it 42 years old in 2025.

What condition is SR 2011 over Spring Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does SR 2011 over Spring Creek carry?

About 3,736 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is SR 2011 over Spring Creek?

The structure is 52 ft (15.8 m) long with a longest span of 52 ft (15.8 m) and a deck 32 ft wide.

Who owns SR 2011 over Spring Creek?

It is owned by the State Highway Agency.