US Bridges

Pine School RD over Trib to Hunters Run

Good

Cumberland County, Pennsylvania · Pine School RD Bridge 2 · Structure no. 000000000060860

Built
2023
2 years old
Condition
Good
inspected March 2024
Type
Culvert
Concrete
Length
21 ft
1 main span
Daily traffic
300
2024 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Pine School RD over Trib to Hunters Run is a concrete culvert carrying Pine School RD over Trib to Hunters Run in Cumberland County, Pennsylvania. It was built in 2023, so it is 2 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 300 vehicles a day, roughly 10% of them trucks, projected to reach 350 by 2044. The structure is 21 ft (6.4 m) long and 32 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesPine School RD
CrossesTrib to Hunters Run
LocationPine School RD Bridge 2
RouteCity Street 0
Coordinates40.06457, -77.17331
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47.8 US tons
Inventory rating39.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckOther
Main spans1
Design loadHL 93
Structure length21 ft (6.4 m)
Longest span21 ft (6.4 m)
Deck width32 ft (9.9 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic300 (2024)
Projected traffic350 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Pine School RD over Trib to Hunters Run built?

It was built in 2023, making it 2 years old in 2025.

What condition is Pine School RD over Trib to Hunters Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Pine School RD over Trib to Hunters Run carry?

About 300 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Pine School RD over Trib to Hunters Run?

The structure is 21 ft (6.4 m) long with a longest span of 21 ft (6.4 m) and a deck 32 ft wide.

Who owns Pine School RD over Trib to Hunters Run?

It is owned by the Town or Township Highway Agency.