US Bridges

SR 3006 Pine Rd. over Spruce Run

Fair

Cumberland County, Pennsylvania · 2.5 MI W of Mnt Hollyspr · Structure no. 000000000013927

Built
1956
69 years old
Condition
Fair
inspected March 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
38 ft
1 main span
Daily traffic
972
2024 count
Owner
State
State Highway Agency

About this bridge

SR 3006 Pine Rd. over Spruce Run is a prestressed concrete box beam or girders - multiple carrying SR 3006 Pine Rd. over Spruce Run in Cumberland County, Pennsylvania. It was built in 1956, so it is 69 years old, older than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 972 vehicles a day, roughly 8% of them trucks, projected to reach 1,695 by 2032. The structure is 38 ft (11.6 m) long and 33 ft wide. If it were closed, the detour would be 8.7 mi (14 km).

CarriesSR 3006 Pine Rd.
CrossesSpruce Run
Location2.5 MI W of Mnt Hollyspr
RouteState Highway 0
Coordinates40.11755, -77.23527
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating92 US tons
Inventory rating47 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 20
Structure length38 ft (11.6 m)
Longest span34 ft (10.4 m)
Deck width33 ft (10.1 m)
Roadway width31 ft (9.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic972 (2024)
Projected traffic1,695 by 2032
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.7 mi (14 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$119,000
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 3006 Pine Rd. over Spruce Run built?

It was built in 1956, making it 69 years old in 2025.

What condition is SR 3006 Pine Rd. over Spruce Run in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does SR 3006 Pine Rd. over Spruce Run carry?

About 972 vehicles per day (2024 count), of which roughly 8% are trucks.

How long is SR 3006 Pine Rd. over Spruce Run?

The structure is 38 ft (11.6 m) long with a longest span of 34 ft (10.4 m) and a deck 33 ft wide.

Who owns SR 3006 Pine Rd. over Spruce Run?

It is owned by the State Highway Agency.