SR 79 S.B. over Over Bike Trail Tr.Frenc
GoodCrawford County, Pennsylvania · Union Township · Structure no. 000000000042363
- Built
- 2004
- 21 years old
- Condition
- Good
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 295 ft
- 2 main spans
- Daily traffic
- 8,167
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 79 S.B. over Over Bike Trail Tr.Frenc is a prestressed concrete continuous stringer/multi-beam or girder carrying SR 79 S.B. over Over Bike Trail Tr.Frenc in Crawford County, Pennsylvania. It was built in 2004, so it is 21 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 8,167 vehicles a day, roughly 22% of them trucks, projected to reach 11,306 by 2032. The structure is 295 ft (89.9 m) long and 45 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 79 S.B. over Over Bike Trail Tr.Frenc built?
It was built in 2004, making it 21 years old in 2025.
What condition is SR 79 S.B. over Over Bike Trail Tr.Frenc in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does SR 79 S.B. over Over Bike Trail Tr.Frenc carry?
About 8,167 vehicles per day (2024 count), of which roughly 22% are trucks.
How long is SR 79 S.B. over Over Bike Trail Tr.Frenc?
The structure is 295 ft (89.9 m) long with a longest span of 146 ft (44.5 m) and a deck 45 ft wide.
Who owns SR 79 S.B. over Over Bike Trail Tr.Frenc?
It is owned by the State Highway Agency.