West Center Street over Over Mill Run
FairCrawford County, Pennsylvania · Center Street Meadville · Structure no. 000000000013521
- Built
- 1906
- 119 years old, rebuilt 1979
- Condition
- Fair
- inspected October 2024
- Type
- Slab
- Concrete
- Length
- 25 ft
- 1 main span
- Daily traffic
- 1,500
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
West Center Street over Over Mill Run is a concrete slab carrying West Center Street over Over Mill Run in Crawford County, Pennsylvania. It was built in 1906 and reconstructed in 1979, so it is 119 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,500 vehicles a day, roughly 2% of them trucks, projected to reach 1,875 by 2044. The structure is 25 ft (7.6 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was West Center Street over Over Mill Run built?
It was built in 1906, making it 119 years old in 2025. It was reconstructed in 1979.
What condition is West Center Street over Over Mill Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does West Center Street over Over Mill Run carry?
About 1,500 vehicles per day (2024 count), of which roughly 2% are trucks.
How long is West Center Street over Over Mill Run?
The structure is 25 ft (7.6 m) long with a longest span of 22 ft (6.7 m) and a deck 40 ft wide.
Who owns West Center Street over Over Mill Run?
It is owned by the City or Municipal Highway Agency.