SR 4012 Shadeland over Over Stone Run
GoodCrawford County, Pennsylvania · Beaver Township · Structure no. 000000000013378
- Built
- 1989
- 36 years old
- Condition
- Good
- inspected December 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 33 ft
- 1 main span
- Daily traffic
- 192
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 4012 Shadeland over Over Stone Run is a prestressed concrete box beam or girders - multiple carrying SR 4012 Shadeland over Over Stone Run in Crawford County, Pennsylvania. It was built in 1989, so it is 36 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 192 vehicles a day, roughly 11% of them trucks, projected to reach 233 by 2032. The structure is 33 ft (10.1 m) long and 32 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 4012 Shadeland over Over Stone Run built?
It was built in 1989, making it 36 years old in 2025.
What condition is SR 4012 Shadeland over Over Stone Run in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does SR 4012 Shadeland over Over Stone Run carry?
About 192 vehicles per day (2024 count), of which roughly 11% are trucks.
How long is SR 4012 Shadeland over Over Stone Run?
The structure is 33 ft (10.1 m) long with a longest span of 30 ft (9.1 m) and a deck 32 ft wide.
Who owns SR 4012 Shadeland over Over Stone Run?
It is owned by the State Highway Agency.