US Bridges

SR 0080 Ebl over Over SR 2028

Good

Columbia County, Pennsylvania · 1.5 MI S of Mifflinville · Structure no. 000000000012521

Built
1964
61 years old, rebuilt 2007
Condition
Good
inspected February 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
120 ft
2 main spans
Daily traffic
13,998
2024 count
Owner
State
State Highway Agency

About this bridge

SR 0080 Ebl over Over SR 2028 is a steel continuous stringer/multi-beam or girder carrying SR 0080 Ebl over Over SR 2028 in Columbia County, Pennsylvania. It was built in 1964 and reconstructed in 2007, so it is 61 years old, older than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,998 vehicles a day, roughly 46% of them trucks, projected to reach 23,804 by 2032. The structure is 120 ft (36.6 m) long and 43 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSR 0080 Ebl
CrossesOver SR 2028
Location1.5 MI S of Mifflinville
RouteInterstate 80
Coordinates41.01478, -76.30314
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating78 US tons
Inventory rating46 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadH 20
Structure length120 ft (36.6 m)
Longest span69 ft (21 m)
Deck width43 ft (13.2 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,998 (2024)
Projected traffic23,804 by 2032
Trucks46%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 0080 Ebl over Over SR 2028 built?

It was built in 1964, making it 61 years old in 2025. It was reconstructed in 2007.

What condition is SR 0080 Ebl over Over SR 2028 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does SR 0080 Ebl over Over SR 2028 carry?

About 13,998 vehicles per day (2024 count), of which roughly 46% are trucks.

How long is SR 0080 Ebl over Over SR 2028?

The structure is 120 ft (36.6 m) long with a longest span of 69 ft (21 m) and a deck 43 ft wide.

Who owns SR 0080 Ebl over Over SR 2028?

It is owned by the State Highway Agency.