W Hemlockrd SR4053 over I-80 Ebl & Wbl
FairColumbia County, Pennsylvania · 4 MI E of Danville Exit · Structure no. 000000000012488
- Built
- 1963
- 62 years old, rebuilt 1994
- Condition
- Fair
- inspected March 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 248 ft
- 5 main spans
- Daily traffic
- 172
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
W Hemlockrd SR4053 over I-80 Ebl & Wbl is a prestressed concrete box beam or girders - multiple carrying W Hemlockrd SR4053 over I-80 Ebl & Wbl in Columbia County, Pennsylvania. It was built in 1963 and reconstructed in 1994, so it is 62 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 172 vehicles a day, roughly 7% of them trucks, projected to reach 229 by 2032. The structure is 248 ft (75.6 m) long and 33 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was W Hemlockrd SR4053 over I-80 Ebl & Wbl built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1994.
What condition is W Hemlockrd SR4053 over I-80 Ebl & Wbl in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does W Hemlockrd SR4053 over I-80 Ebl & Wbl carry?
About 172 vehicles per day (2024 count), of which roughly 7% are trucks.
How long is W Hemlockrd SR4053 over I-80 Ebl & Wbl?
The structure is 248 ft (75.6 m) long with a longest span of 66 ft (20.1 m) and a deck 33 ft wide.
Who owns W Hemlockrd SR4053 over I-80 Ebl & Wbl?
It is owned by the State Highway Agency.