US Bridges

SR 220-US 220 over T-375

Fair

Clinton County, Pennsylvania · 1 Mile East Castanea · Structure no. 000000000012216

Built
1976
49 years old
Condition
Fair
inspected May 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
105 ft
3 main spans
Daily traffic
9,195
2024 count
Owner
State
State Highway Agency

About this bridge

SR 220-US 220 over T-375 is a prestressed concrete box beam or girders - multiple carrying SR 220-US 220 over T-375 in Clinton County, Pennsylvania. It was built in 1976, so it is 49 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 9,195 vehicles a day, roughly 13% of them trucks, projected to reach 11,440 by 2044. The structure is 105 ft (32 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR 220-US 220
CrossesT-375
Location1 Mile East Castanea
RouteU.S. Route 220
Coordinates41.13162, -77.41251
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.1 US tons
Inventory rating38 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length105 ft (32 m)
Longest span50 ft (15.2 m)
Deck width46 ft (14 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,195 (2024)
Projected traffic11,440 by 2044
Trucks13%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 220-US 220 over T-375 built?

It was built in 1976, making it 49 years old in 2025.

What condition is SR 220-US 220 over T-375 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does SR 220-US 220 over T-375 carry?

About 9,195 vehicles per day (2024 count), of which roughly 13% are trucks.

How long is SR 220-US 220 over T-375?

The structure is 105 ft (32 m) long with a longest span of 50 ft (15.2 m) and a deck 46 ft wide.

Who owns SR 220-US 220 over T-375?

It is owned by the State Highway Agency.