SR 120-PA 120 over Norfolk and Southern
FairClinton County, Pennsylvania · Renovo Boro · Structure no. 000000000012095
- Built
- 1970
- 55 years old, rebuilt 2023
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 202 ft
- 2 main spans
- Daily traffic
- 1,560
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 120-PA 120 over Norfolk and Southern is a steel continuous stringer/multi-beam or girder carrying SR 120-PA 120 over Norfolk and Southern in Clinton County, Pennsylvania. It was built in 1970 and reconstructed in 2023, so it is 55 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,560 vehicles a day, roughly 8% of them trucks, projected to reach 2,136 by 2044. The structure is 202 ft (61.6 m) long and 54 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 120-PA 120 over Norfolk and Southern built?
It was built in 1970, making it 55 years old in 2025. It was reconstructed in 2023.
What condition is SR 120-PA 120 over Norfolk and Southern in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does SR 120-PA 120 over Norfolk and Southern carry?
About 1,560 vehicles per day (2023 count), of which roughly 8% are trucks.
How long is SR 120-PA 120 over Norfolk and Southern?
The structure is 202 ft (61.6 m) long with a longest span of 104 ft (31.7 m) and a deck 54 ft wide.
Who owns SR 120-PA 120 over Norfolk and Southern?
It is owned by the State Highway Agency.