SR 253-PA 253 over Rail/Trail (houtzdale)
FairClearfield County, Pennsylvania · Ramey Boro · Structure no. 000000000011438
- Built
- 1984
- 41 years old
- Condition
- Fair
- inspected August 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 44 ft
- 1 main span
- Daily traffic
- 1,512
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 253-PA 253 over Rail/Trail (houtzdale) is a prestressed concrete box beam or girders - multiple carrying SR 253-PA 253 over Rail/Trail (houtzdale) in Clearfield County, Pennsylvania. It was built in 1984, so it is 41 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,512 vehicles a day, roughly 5% of them trucks, projected to reach 2,295 by 2044. The structure is 44 ft (13.4 m) long and 36 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 253-PA 253 over Rail/Trail (houtzdale) built?
It was built in 1984, making it 41 years old in 2025.
What condition is SR 253-PA 253 over Rail/Trail (houtzdale) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does SR 253-PA 253 over Rail/Trail (houtzdale) carry?
About 1,512 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is SR 253-PA 253 over Rail/Trail (houtzdale)?
The structure is 44 ft (13.4 m) long with a longest span of 42 ft (12.8 m) and a deck 36 ft wide.
Who owns SR 253-PA 253 over Rail/Trail (houtzdale)?
It is owned by the State Highway Agency.