US Bridges

T-562 Sarvey Mill over Toby Creek

Fair

Clarion County, Pennsylvania · 1.2 MI NW Int. W/ SR1005 · Structure no. 000000000011124

Built
1996
29 years old
Condition
Fair
inspected September 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
43 ft
1 main span
Daily traffic
50
2021 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T-562 Sarvey Mill over Toby Creek is a prestressed concrete box beam or girders - multiple carrying T-562 Sarvey Mill over Toby Creek in Clarion County, Pennsylvania. It was built in 1996, so it is 29 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50 vehicles a day, roughly 5% of them trucks, projected to reach 70 by 2043. The structure is 43 ft (13.1 m) long and 28 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesT-562 Sarvey Mill
CrossesToby Creek
Location1.2 MI NW Int. W/ SR1005
RouteCity Street 0
Coordinates41.29974, -79.32967
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating100 US tons
Inventory rating55 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadUnknown
Structure length43 ft (13.1 m)
Longest span41 ft (12.5 m)
Deck width28 ft (8.6 m)
Roadway width25 ft (7.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2021)
Projected traffic70 by 2043
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$123,000
NavigationNo navigation control on waterway

Frequently asked questions

When was T-562 Sarvey Mill over Toby Creek built?

It was built in 1996, making it 29 years old in 2025.

What condition is T-562 Sarvey Mill over Toby Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does T-562 Sarvey Mill over Toby Creek carry?

About 50 vehicles per day (2021 count), of which roughly 5% are trucks.

How long is T-562 Sarvey Mill over Toby Creek?

The structure is 43 ft (13.1 m) long with a longest span of 41 ft (12.5 m) and a deck 28 ft wide.

Who owns T-562 Sarvey Mill over Toby Creek?

It is owned by the Town or Township Highway Agency.