New Garden Sta RD over East Br White Clay Creek
FairChester County, Pennsylvania · London Grove Twp. 46E12 · Structure no. 000000000010652
- Built
- 1984
- 41 years old
- Condition
- Fair
- inspected June 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 61 ft
- 1 main span
- Daily traffic
- 4,524
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
New Garden Sta RD over East Br White Clay Creek is a prestressed concrete box beam or girders - multiple carrying New Garden Sta RD over East Br White Clay Creek in Chester County, Pennsylvania. It was built in 1984, so it is 41 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,524 vehicles a day, roughly 10% of them trucks, projected to reach 5,520 by 2019. The structure is 61 ft (18.6 m) long and 31 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was New Garden Sta RD over East Br White Clay Creek built?
It was built in 1984, making it 41 years old in 2025.
What condition is New Garden Sta RD over East Br White Clay Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does New Garden Sta RD over East Br White Clay Creek carry?
About 4,524 vehicles per day (2019 count), of which roughly 10% are trucks.
How long is New Garden Sta RD over East Br White Clay Creek?
The structure is 61 ft (18.6 m) long with a longest span of 57 ft (17.4 m) and a deck 31 ft wide.
Who owns New Garden Sta RD over East Br White Clay Creek?
It is owned by the County Highway Agency.