US Bridges

SR 6126 over SR 80-I 80

Good

Centre County, Pennsylvania · 2.8 MI E. Exit 161 Belle. · Structure no. 000000000057353

Built
2022
3 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
541 ft
4 main spans
Daily traffic
405
2024 count
Owner
State
State Highway Agency

About this bridge

SR 6126 over SR 80-I 80 is a prestressed concrete continuous stringer/multi-beam or girder carrying SR 6126 over SR 80-I 80 in Centre County, Pennsylvania. It was built in 2022, so it is 3 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 405 vehicles a day, roughly 10% of them trucks, projected to reach 200 by 2044. The structure is 541 ft (164.9 m) long and 55 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR 6126
CrossesSR 80-I 80
Location2.8 MI E. Exit 161 Belle.
RouteState Highway 0
Coordinates40.96246, -77.67093
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51.5 US tons
Inventory rating34.6 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length541 ft (164.9 m)
Longest span135 ft (41.1 m)
Deck width55 ft (16.9 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic405 (2024)
Projected traffic200 by 2044
Trucks10%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 6126 over SR 80-I 80 built?

It was built in 2022, making it 3 years old in 2025.

What condition is SR 6126 over SR 80-I 80 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does SR 6126 over SR 80-I 80 carry?

About 405 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is SR 6126 over SR 80-I 80?

The structure is 541 ft (164.9 m) long with a longest span of 135 ft (41.1 m) and a deck 55 ft wide.

Who owns SR 6126 over SR 80-I 80?

It is owned by the State Highway Agency.