US Bridges

SR 144-PA 144 over Trib Wallace Run

Good

Centre County, Pennsylvania · Gum Stump · Structure no. 000000000057236

Built
2019
6 years old
Condition
Good
inspected June 2024
Type
Culvert
Concrete
Length
23 ft
1 main span
Daily traffic
996
2023 count
Owner
State
State Highway Agency

About this bridge

SR 144-PA 144 over Trib Wallace Run is a concrete culvert carrying SR 144-PA 144 over Trib Wallace Run in Centre County, Pennsylvania. It was built in 2019, so it is 6 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 996 vehicles a day, roughly 7% of them trucks, projected to reach 1,500 by 2044. The structure is 23 ft (7 m) long. If it were closed, the detour would be 24.9 mi (40 km).

CarriesSR 144-PA 144
CrossesTrib Wallace Run
LocationGum Stump
RouteState Highway 144
Coordinates40.9808, -77.84873
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating107.1 US tons
Inventory rating72.5 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length23 ft (7 m)
Longest span23 ft (7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic996 (2023)
Projected traffic1,500 by 2044
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed24.9 mi (40 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 144-PA 144 over Trib Wallace Run built?

It was built in 2019, making it 6 years old in 2025.

What condition is SR 144-PA 144 over Trib Wallace Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does SR 144-PA 144 over Trib Wallace Run carry?

About 996 vehicles per day (2023 count), of which roughly 7% are trucks.

How long is SR 144-PA 144 over Trib Wallace Run?

The structure is 23 ft (7 m) long with a longest span of 23 ft (7 m).

Who owns SR 144-PA 144 over Trib Wallace Run?

It is owned by the State Highway Agency.