US Bridges

SR 2018 over Pine Creek

Good

Centre County, Pennsylvania · 1 MI NE Coburn · Structure no. 000000000054513

Built
2017
8 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
82 ft
1 main span
Daily traffic
165
2024 count
Owner
State
State Highway Agency

About this bridge

SR 2018 over Pine Creek is a prestressed concrete stringer/multi-beam or girder carrying SR 2018 over Pine Creek in Centre County, Pennsylvania. It was built in 2017, so it is 8 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 165 vehicles a day, roughly 7% of them trucks, projected to reach 500 by 2043. The structure is 82 ft (25 m) long and 28 ft wide. If it were closed, the detour would be 11.2 mi (18 km).

CarriesSR 2018
CrossesPine Creek
Location1 MI NE Coburn
RouteState Highway 0
Coordinates40.87698, -77.43675
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating56.4 US tons
Inventory rating43.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length82 ft (25 m)
Longest span79 ft (24.1 m)
Deck width28 ft (8.4 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic165 (2024)
Projected traffic500 by 2043
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed11.2 mi (18 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 2018 over Pine Creek built?

It was built in 2017, making it 8 years old in 2025.

What condition is SR 2018 over Pine Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does SR 2018 over Pine Creek carry?

About 165 vehicles per day (2024 count), of which roughly 7% are trucks.

How long is SR 2018 over Pine Creek?

The structure is 82 ft (25 m) long with a longest span of 79 ft (24.1 m) and a deck 28 ft wide.

Who owns SR 2018 over Pine Creek?

It is owned by the State Highway Agency.