SR 99-I 99 over Bald Eagle C/Sr 3040
GoodCentre County, Pennsylvania · 1 Mile South Port Matilda · Structure no. 000000000043357
- Built
- 2006
- 19 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 580 ft
- 4 main spans
- Daily traffic
- 6,583
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 99-I 99 over Bald Eagle C/Sr 3040 is a prestressed concrete continuous stringer/multi-beam or girder carrying SR 99-I 99 over Bald Eagle C/Sr 3040 in Centre County, Pennsylvania. It was built in 2006, so it is 19 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,583 vehicles a day, roughly 17% of them trucks, projected to reach 8,532 by 2044. The structure is 580 ft (176.8 m) long and 43 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 99-I 99 over Bald Eagle C/Sr 3040 built?
It was built in 2006, making it 19 years old in 2025.
What condition is SR 99-I 99 over Bald Eagle C/Sr 3040 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does SR 99-I 99 over Bald Eagle C/Sr 3040 carry?
About 6,583 vehicles per day (2023 count), of which roughly 17% are trucks.
How long is SR 99-I 99 over Bald Eagle C/Sr 3040?
The structure is 580 ft (176.8 m) long with a longest span of 144 ft (43.9 m) and a deck 43 ft wide.
Who owns SR 99-I 99 over Bald Eagle C/Sr 3040?
It is owned by the State Highway Agency.