US Bridges

T-302 over Sterling Run

Good

Cameron County, Pennsylvania · 400 Ft S of SR 120 · Structure no. 000000000057073

Built
2019
6 years old
Condition
Good
inspected October 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
55 ft
1 main span
Daily traffic
75
2021 count
Owner
County
County Highway Agency

About this bridge

T-302 over Sterling Run is a prestressed concrete box beam or girders - multiple carrying T-302 over Sterling Run in Cameron County, Pennsylvania. It was built in 2019, so it is 6 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 75 vehicles a day, projected to reach 84 by 2041. The structure is 55 ft (16.8 m) long and 20 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesT-302
CrossesSterling Run
Location400 Ft S of SR 120
RouteCity Street 0
Coordinates41.41406, -78.19979
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating62.2 US tons
Inventory rating48.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length55 ft (16.8 m)
Longest span54 ft (16.5 m)
Deck width20 ft (6.2 m)
Roadway width18 ft (5.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75 (2021)
Projected traffic84 by 2041
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T-302 over Sterling Run built?

It was built in 2019, making it 6 years old in 2025.

What condition is T-302 over Sterling Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does T-302 over Sterling Run carry?

About 75 vehicles per day (2021 count).

How long is T-302 over Sterling Run?

The structure is 55 ft (16.8 m) long with a longest span of 54 ft (16.5 m) and a deck 20 ft wide.

Who owns T-302 over Sterling Run?

It is owned by the County Highway Agency.