US 219 Nbl over Rails to Trails
FairCambria County, Pennsylvania · 0.5 Mile South of TR 422 · Structure no. 000000000008475
- Built
- 1975
- 50 years old, rebuilt 2006
- Condition
- Fair
- inspected May 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 146 ft
- 3 main spans
- Daily traffic
- 6,206
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
US 219 Nbl over Rails to Trails is a prestressed concrete box beam or girders - multiple carrying US 219 Nbl over Rails to Trails in Cambria County, Pennsylvania. It was built in 1975 and reconstructed in 2006, so it is 50 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,206 vehicles a day, roughly 12% of them trucks, projected to reach 6,522 by 2032. The structure is 146 ft (44.5 m) long and 46 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 219 Nbl over Rails to Trails built?
It was built in 1975, making it 50 years old in 2025. It was reconstructed in 2006.
What condition is US 219 Nbl over Rails to Trails in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does US 219 Nbl over Rails to Trails carry?
About 6,206 vehicles per day (2024 count), of which roughly 12% are trucks.
How long is US 219 Nbl over Rails to Trails?
The structure is 146 ft (44.5 m) long with a longest span of 47 ft (14.3 m) and a deck 46 ft wide.
Who owns US 219 Nbl over Rails to Trails?
It is owned by the State Highway Agency.