US Bridges

T-427 Boy Scout RD over Semiconon Run

Fair

Butler County, Pennsylvania · 10 from Int W/T392 · Structure no. 000000000043452

Built
2004
21 years old
Condition
Fair
inspected August 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
43 ft
1 main span
Daily traffic
100
2015 count
Owner
County
County Highway Agency

About this bridge

T-427 Boy Scout RD over Semiconon Run is a steel stringer/multi-beam or girder carrying T-427 Boy Scout RD over Semiconon Run in Butler County, Pennsylvania. It was built in 2004, so it is 21 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 100 vehicles a day, roughly 9% of them trucks, projected to reach 120 by 2035. The structure is 43 ft (13.1 m) long and 24 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesT-427 Boy Scout RD
CrossesSemiconon Run
Location10 from Int W/T392
RouteCity Street 0
Coordinates40.85251, -80.0238
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating75.9 US tons
Inventory rating46 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length43 ft (13.1 m)
Longest span42 ft (12.8 m)
Deck width24 ft (7.3 m)
Roadway width22 ft (6.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2015)
Projected traffic120 by 2035
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T-427 Boy Scout RD over Semiconon Run built?

It was built in 2004, making it 21 years old in 2025.

What condition is T-427 Boy Scout RD over Semiconon Run in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does T-427 Boy Scout RD over Semiconon Run carry?

About 100 vehicles per day (2015 count), of which roughly 9% are trucks.

How long is T-427 Boy Scout RD over Semiconon Run?

The structure is 43 ft (13.1 m) long with a longest span of 42 ft (12.8 m) and a deck 24 ft wide.

Who owns T-427 Boy Scout RD over Semiconon Run?

It is owned by the County Highway Agency.