SR0308 over B&le RR Crk T-675
FairButler County, Pennsylvania · Stony Run · Structure no. 000000000007924
- Built
- 1956
- 69 years old, rebuilt 2010
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 411 ft
- 4 main spans
- Daily traffic
- 3,384
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR0308 over B&le RR Crk T-675 is a steel continuous stringer/multi-beam or girder carrying SR0308 over B&le RR Crk T-675 in Butler County, Pennsylvania. It was built in 1956 and reconstructed in 2010, so it is 69 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,384 vehicles a day, roughly 16% of them trucks, projected to reach 5,085 by 2032. The structure is 411 ft (125.3 m) long and 29 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR0308 over B&le RR Crk T-675 built?
It was built in 1956, making it 69 years old in 2025. It was reconstructed in 2010.
What condition is SR0308 over B&le RR Crk T-675 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does SR0308 over B&le RR Crk T-675 carry?
About 3,384 vehicles per day (2023 count), of which roughly 16% are trucks.
How long is SR0308 over B&le RR Crk T-675?
The structure is 411 ft (125.3 m) long with a longest span of 115 ft (35.1 m) and a deck 29 ft wide.
Who owns SR0308 over B&le RR Crk T-675?
It is owned by the State Highway Agency.