US Bridges

Interstate 295 EB over Taylorsville RD

Good

Bucks County, Pennsylvania · Overtaylorsville RD · Structure no. 000000000068393

Built
2021
4 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
107 ft
1 main span
Daily traffic
15,753
2024 count
Owner
Toll Authority
Local Toll Authority

About this bridge

Interstate 295 EB over Taylorsville RD is a steel stringer/multi-beam or girder carrying Interstate 295 EB over Taylorsville RD in Bucks County, Pennsylvania. It was built in 2021, so it is 4 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 15,753 vehicles a day, roughly 5% of them trucks, projected to reach 33,800 by 2043. The structure is 107 ft (32.6 m) long and 78 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesInterstate 295 EB
CrossesTaylorsville RD
LocationOvertaylorsville RD
RouteInterstate 295
Coordinates40.25503, -74.85432
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.4 US tons
Inventory rating46.4 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length107 ft (32.6 m)
Longest span104 ft (31.7 m)
Deck width78 ft (23.9 m)
Roadway width75 ft (22.8 m)
Vertical clearance over deck17 ft (5.1 m)

Traffic and service

Average daily traffic15,753 (2024)
Projected traffic33,800 by 2043
Trucks5%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Interstate 295 EB over Taylorsville RD built?

It was built in 2021, making it 4 years old in 2025.

What condition is Interstate 295 EB over Taylorsville RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Interstate 295 EB over Taylorsville RD carry?

About 15,753 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is Interstate 295 EB over Taylorsville RD?

The structure is 107 ft (32.6 m) long with a longest span of 104 ft (31.7 m) and a deck 78 ft wide.

Who owns Interstate 295 EB over Taylorsville RD?

It is owned by the Local Toll Authority.