Ivyland Road over Branch Little Neshaminy
FairBucks County, Pennsylvania · Warminster Twp 34J04 · Structure no. 000000000007494
- Built
- 1984
- 41 years old
- Condition
- Fair
- inspected March 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 30 ft
- 1 main span
- Daily traffic
- 750
- 1998 count
- Owner
- County
- County Highway Agency
About this bridge
Ivyland Road over Branch Little Neshaminy is a prestressed concrete box beam or girders - multiple carrying Ivyland Road over Branch Little Neshaminy in Bucks County, Pennsylvania. It was built in 1984, so it is 41 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 750 vehicles a day, roughly 5% of them trucks, projected to reach 1,050 by 2011. The structure is 30 ft (9.1 m) long and 38 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ivyland Road over Branch Little Neshaminy built?
It was built in 1984, making it 41 years old in 2025.
What condition is Ivyland Road over Branch Little Neshaminy in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Ivyland Road over Branch Little Neshaminy carry?
About 750 vehicles per day (1998 count), of which roughly 5% are trucks.
How long is Ivyland Road over Branch Little Neshaminy?
The structure is 30 ft (9.1 m) long with a longest span of 30 ft (9.1 m) and a deck 38 ft wide.
Who owns Ivyland Road over Branch Little Neshaminy?
It is owned by the County Highway Agency.