Second Street Pike over Neshaminy Creek
FairBucks County, Pennsylvania · Chain Bridge 30J10 · Structure no. 000000000006956
- Built
- 1982
- 43 years old
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 259 ft
- 3 main spans
- Daily traffic
- 5,971
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Second Street Pike over Neshaminy Creek is a prestressed concrete stringer/multi-beam or girder carrying Second Street Pike over Neshaminy Creek in Bucks County, Pennsylvania. It was built in 1982, so it is 43 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,971 vehicles a day, roughly 9% of them trucks, projected to reach 9,322 by 2032. The structure is 259 ft (78.9 m) long and 48 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Second Street Pike over Neshaminy Creek built?
It was built in 1982, making it 43 years old in 2025.
What condition is Second Street Pike over Neshaminy Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Second Street Pike over Neshaminy Creek carry?
About 5,971 vehicles per day (2024 count), of which roughly 9% are trucks.
How long is Second Street Pike over Neshaminy Creek?
The structure is 259 ft (78.9 m) long with a longest span of 84 ft (25.6 m) and a deck 48 ft wide.
Who owns Second Street Pike over Neshaminy Creek?
It is owned by the State Highway Agency.