US Bridges

I-95(NB) & Ramp B over Station Avenue

Fair

Bucks County, Pennsylvania · 1MI.N.ANDALUSIA 45G03 · Structure no. 000000000006833

Built
1964
61 years old, rebuilt 1997
Condition
Fair
inspected February 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
53 ft
1 main span
Daily traffic
50,832
2024 count
Owner
State
State Highway Agency

About this bridge

I-95(NB) & Ramp B over Station Avenue is a prestressed concrete box beam or girders - multiple carrying I-95(NB) & Ramp B over Station Avenue in Bucks County, Pennsylvania. It was built in 1964 and reconstructed in 1997, so it is 61 years old, older than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50,832 vehicles a day, roughly 5% of them trucks, projected to reach 54,814 by 2032. The structure is 53 ft (16.2 m) long and 69 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-95(NB) & Ramp B
CrossesStation Avenue
Location1MI.N.ANDALUSIA 45G03
RouteInterstate 95
Coordinates40.07273, -74.95197
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73 US tons
Inventory rating38 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length53 ft (16.2 m)
Longest span52 ft (15.8 m)
Deck width69 ft (20.9 m)
Roadway width64 ft (19.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50,832 (2024)
Projected traffic54,814 by 2032
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$130,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95(NB) & Ramp B over Station Avenue built?

It was built in 1964, making it 61 years old in 2025. It was reconstructed in 1997.

What condition is I-95(NB) & Ramp B over Station Avenue in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does I-95(NB) & Ramp B over Station Avenue carry?

About 50,832 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is I-95(NB) & Ramp B over Station Avenue?

The structure is 53 ft (16.2 m) long with a longest span of 52 ft (15.8 m) and a deck 69 ft wide.

Who owns I-95(NB) & Ramp B over Station Avenue?

It is owned by the State Highway Agency.