US Bridges

T-730 Goose Hollow over Spaulding Creek

Good

Bradford County, Pennsylvania · 3.0 Mi. N of Sheshequin · Structure no. 000000000057392

Built
2020
5 years old
Condition
Good
inspected June 2023
Type
Culvert
Aluminum, Wrought Iron, or Cast Iron
Length
26 ft
1 main span
Daily traffic
50
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T-730 Goose Hollow over Spaulding Creek is a aluminum, wrought iron, or cast iron culvert carrying T-730 Goose Hollow over Spaulding Creek in Bradford County, Pennsylvania. It was built in 2020, so it is 5 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, roughly 4% of them trucks, projected to reach 77 by 2045. The structure is 26 ft (7.9 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesT-730 Goose Hollow
CrossesSpaulding Creek
Location3.0 Mi. N of Sheshequin
RouteCity Street 0
Coordinates41.88714, -76.49058
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75.4 US tons
Inventory rating58.2 US tons

Structure

Structure typeCulvert
MaterialAluminum, Wrought Iron, or Cast Iron
DeckNot applicable
Main spans1
Design loadHL 93
Structure length26 ft (7.9 m)
Longest span26 ft (7.9 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2023)
Projected traffic77 by 2045
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T-730 Goose Hollow over Spaulding Creek built?

It was built in 2020, making it 5 years old in 2025.

What condition is T-730 Goose Hollow over Spaulding Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does T-730 Goose Hollow over Spaulding Creek carry?

About 50 vehicles per day (2023 count), of which roughly 4% are trucks.

How long is T-730 Goose Hollow over Spaulding Creek?

The structure is 26 ft (7.9 m) long with a longest span of 26 ft (7.9 m).

Who owns T-730 Goose Hollow over Spaulding Creek?

It is owned by the Town or Township Highway Agency.