SR 4022 over Over Chemung River
FairBradford County, Pennsylvania · Chemung River Bridge · Structure no. 000000000006519
- Built
- 1974
- 51 years old
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 723 ft
- 5 main spans
- Daily traffic
- 4,801
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 4022 over Over Chemung River is a steel continuous stringer/multi-beam or girder carrying SR 4022 over Over Chemung River in Bradford County, Pennsylvania. It was built in 1974, so it is 51 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,801 vehicles a day, roughly 13% of them trucks, projected to reach 6,703 by 2032. The structure is 723 ft (220.4 m) long and 48 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 4022 over Over Chemung River built?
It was built in 1974, making it 51 years old in 2025.
What condition is SR 4022 over Over Chemung River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does SR 4022 over Over Chemung River carry?
About 4,801 vehicles per day (2024 count), of which roughly 13% are trucks.
How long is SR 4022 over Over Chemung River?
The structure is 723 ft (220.4 m) long with a longest span of 129 ft (39.3 m) and a deck 48 ft wide.
Who owns SR 4022 over Over Chemung River?
It is owned by the State Highway Agency.