SR 199 over Chemung River
GoodBradford County, Pennsylvania · Athens Chemung River Br. · Structure no. 000000000006131
- Built
- 1987
- 38 years old, rebuilt 2009
- Condition
- Good
- inspected July 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 451 ft
- 4 main spans
- Daily traffic
- 2,602
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 199 over Chemung River is a prestressed concrete continuous box beam or girders - multiple carrying SR 199 over Chemung River in Bradford County, Pennsylvania. It was built in 1987 and reconstructed in 2009, so it is 38 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,602 vehicles a day, roughly 7% of them trucks, projected to reach 3,309 by 2032. The structure is 451 ft (137.5 m) long and 37 ft wide. If it were closed, the detour would be 11.2 mi (18 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 199 over Chemung River built?
It was built in 1987, making it 38 years old in 2025. It was reconstructed in 2009.
What condition is SR 199 over Chemung River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does SR 199 over Chemung River carry?
About 2,602 vehicles per day (2024 count), of which roughly 7% are trucks.
How long is SR 199 over Chemung River?
The structure is 451 ft (137.5 m) long with a longest span of 113 ft (34.4 m) and a deck 37 ft wide.
Who owns SR 199 over Chemung River?
It is owned by the State Highway Agency.