US Bridges

SR 4018 over Sandy Run

Good

Blair County, Pennsylvania · Pinecroft · Structure no. 000000000048919

Built
2014
11 years old
Condition
Good
inspected September 2022
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
80 ft
1 main span
Daily traffic
1,538
2024 count
Owner
State
State Highway Agency

About this bridge

SR 4018 over Sandy Run is a prestressed concrete box beam or girders - multiple carrying SR 4018 over Sandy Run in Blair County, Pennsylvania. It was built in 2014, so it is 11 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,538 vehicles a day, roughly 9% of them trucks, projected to reach 1,416 by 2034. The structure is 80 ft (24.4 m) long and 31 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesSR 4018
CrossesSandy Run
LocationPinecroft
RouteState Highway 0
Coordinates40.5696, -78.35096
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67.5 US tons
Inventory rating38.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length80 ft (24.4 m)
Longest span78 ft (23.8 m)
Deck width31 ft (9.6 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,538 (2024)
Projected traffic1,416 by 2034
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 4018 over Sandy Run built?

It was built in 2014, making it 11 years old in 2025.

What condition is SR 4018 over Sandy Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2022.

How much traffic does SR 4018 over Sandy Run carry?

About 1,538 vehicles per day (2024 count), of which roughly 9% are trucks.

How long is SR 4018 over Sandy Run?

The structure is 80 ft (24.4 m) long with a longest span of 78 ft (23.8 m) and a deck 31 ft wide.

Who owns SR 4018 over Sandy Run?

It is owned by the State Highway Agency.