US Bridges

T406 58th Street over Burgoon Run

Fair

Blair County, Pennsylvania · 2 MI SW of Altoona · Structure no. 000000000042212

Built
2003
22 years old
Condition
Fair
inspected October 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
48 ft
1 main span
Daily traffic
532
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T406 58th Street over Burgoon Run is a prestressed concrete box beam or girders - multiple carrying T406 58th Street over Burgoon Run in Blair County, Pennsylvania. It was built in 2003, so it is 22 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 532 vehicles a day, roughly 1% of them trucks, projected to reach 682 by 2043. The structure is 48 ft (14.6 m) long and 35 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesT406 58th Street
CrossesBurgoon Run
Location2 MI SW of Altoona
RouteCity Street 0
Coordinates40.48575, -78.43321
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating89 US tons
Inventory rating51 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length48 ft (14.6 m)
Longest span46 ft (14 m)
Deck width35 ft (10.6 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic532 (2023)
Projected traffic682 by 2043
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T406 58th Street over Burgoon Run built?

It was built in 2003, making it 22 years old in 2025.

What condition is T406 58th Street over Burgoon Run in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does T406 58th Street over Burgoon Run carry?

About 532 vehicles per day (2023 count), of which roughly 1% are trucks.

How long is T406 58th Street over Burgoon Run?

The structure is 48 ft (14.6 m) long with a longest span of 46 ft (14 m) and a deck 35 ft wide.

Who owns T406 58th Street over Burgoon Run?

It is owned by the Town or Township Highway Agency.