US Bridges

West 9th Avenue over Spring Run

Fair

Blair County, Pennsylvania · Park Blvd West 9th Ave · Structure no. 000000000005975

Built
1993
32 years old
Condition
Fair
inspected May 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
25 ft
1 main span
Daily traffic
515
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

West 9th Avenue over Spring Run is a prestressed concrete box beam or girders - multiple carrying West 9th Avenue over Spring Run in Blair County, Pennsylvania. It was built in 1993, so it is 32 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 515 vehicles a day, roughly 3% of them trucks, projected to reach 694 by 2042. The structure is 25 ft (7.6 m) long and 49 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesWest 9th Avenue
CrossesSpring Run
LocationPark Blvd West 9th Ave
RouteCity Street 0
Coordinates40.53361, -78.39218
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65 US tons
Inventory rating28 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 25 or greater
Structure length25 ft (7.6 m)
Longest span22 ft (6.7 m)
Deck width49 ft (15 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic515 (2022)
Projected traffic694 by 2042
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was West 9th Avenue over Spring Run built?

It was built in 1993, making it 32 years old in 2025.

What condition is West 9th Avenue over Spring Run in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.

How much traffic does West 9th Avenue over Spring Run carry?

About 515 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is West 9th Avenue over Spring Run?

The structure is 25 ft (7.6 m) long with a longest span of 22 ft (6.7 m) and a deck 49 ft wide.

Who owns West 9th Avenue over Spring Run?

It is owned by the City or Municipal Highway Agency.