US Bridges

SR 4035 N 4th ST over SR 78 (lr 285)

Good

Berks County, Pennsylvania · Exit #10 Hamburg Int · Structure no. 000000000044367

Built
2006
19 years old
Condition
Good
inspected February 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
92 ft
1 main span
Daily traffic
2,072
2023 count
Owner
State
State Highway Agency

About this bridge

SR 4035 N 4th ST over SR 78 (lr 285) is a prestressed concrete box beam or girders - multiple carrying SR 4035 N 4th ST over SR 78 (lr 285) in Berks County, Pennsylvania. It was built in 2006, so it is 19 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,072 vehicles a day, roughly 4% of them trucks, projected to reach 1,982 by 2032. The structure is 92 ft (28 m) long and 47 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSR 4035 N 4th ST
CrossesSR 78 (lr 285)
LocationExit #10 Hamburg Int
RouteState Highway 0
Coordinates40.56242, -75.98337
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating76.4 US tons
Inventory rating41.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length92 ft (28 m)
Longest span92 ft (28 m)
Deck width47 ft (14.3 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,072 (2023)
Projected traffic1,982 by 2032
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 4035 N 4th ST over SR 78 (lr 285) built?

It was built in 2006, making it 19 years old in 2025.

What condition is SR 4035 N 4th ST over SR 78 (lr 285) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does SR 4035 N 4th ST over SR 78 (lr 285) carry?

About 2,072 vehicles per day (2023 count), of which roughly 4% are trucks.

How long is SR 4035 N 4th ST over SR 78 (lr 285)?

The structure is 92 ft (28 m) long with a longest span of 92 ft (28 m) and a deck 47 ft wide.

Who owns SR 4035 N 4th ST over SR 78 (lr 285)?

It is owned by the State Highway Agency.