SR 2011 (11th St.) over T-413(SPRING Valley Rd.)
FairBerks County, Pennsylvania · 11th St.Over T-413 · Structure no. 000000000005045
- Built
- 1978
- 47 years old
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 169 ft
- 3 main spans
- Daily traffic
- 10,110
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 2011 (11th St.) over T-413(SPRING Valley Rd.) is a prestressed concrete stringer/multi-beam or girder carrying SR 2011 (11th St.) over T-413(SPRING Valley Rd.) in Berks County, Pennsylvania. It was built in 1978, so it is 47 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10,110 vehicles a day, roughly 3% of them trucks, projected to reach 12,982 by 2032. The structure is 169 ft (51.5 m) long and 48 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 2011 (11th St.) over T-413(SPRING Valley Rd.) built?
It was built in 1978, making it 47 years old in 2025.
What condition is SR 2011 (11th St.) over T-413(SPRING Valley Rd.) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does SR 2011 (11th St.) over T-413(SPRING Valley Rd.) carry?
About 10,110 vehicles per day (2024 count), of which roughly 3% are trucks.
How long is SR 2011 (11th St.) over T-413(SPRING Valley Rd.)?
The structure is 169 ft (51.5 m) long with a longest span of 99 ft (30.2 m) and a deck 48 ft wide.
Who owns SR 2011 (11th St.) over T-413(SPRING Valley Rd.)?
It is owned by the State Highway Agency.