US Bridges

T376 Rose Lane over Cove Creek

Good

Bedford County, Pennsylvania · 1 Mi. NW of Rainsburg · Structure no. 000000000054568

Built
2017
8 years old
Condition
Good
inspected September 2023
Type
Culvert
Concrete
Length
23 ft
1 main span
Daily traffic
50
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T376 Rose Lane over Cove Creek is a concrete culvert carrying T376 Rose Lane over Cove Creek in Bedford County, Pennsylvania. It was built in 2017, so it is 8 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, roughly 10% of them trucks, projected to reach 54 by 2043. The structure is 23 ft (7 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesT376 Rose Lane
CrossesCove Creek
Location1 Mi. NW of Rainsburg
RouteCity Street 0
Coordinates39.9045, -78.53473
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.2 US tons
Inventory rating39.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length23 ft (7 m)
Longest span20 ft (6.1 m)
Deck width30 ft (9.1 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2023)
Projected traffic54 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T376 Rose Lane over Cove Creek built?

It was built in 2017, making it 8 years old in 2025.

What condition is T376 Rose Lane over Cove Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does T376 Rose Lane over Cove Creek carry?

About 50 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is T376 Rose Lane over Cove Creek?

The structure is 23 ft (7 m) long with a longest span of 20 ft (6.1 m) and a deck 30 ft wide.

Who owns T376 Rose Lane over Cove Creek?

It is owned by the Town or Township Highway Agency.