SR 1005(OLD Pa 36) over Yellow Creek Relief Chan
GoodBedford County, Pennsylvania · 0.05 Mile S. from Pa 36 · Structure no. 000000000004002
- Built
- 1997
- 28 years old, rebuilt 2012
- Condition
- Good
- inspected September 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 107 ft
- 1 main span
- Daily traffic
- 624
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 1005(OLD Pa 36) over Yellow Creek Relief Chan is a prestressed concrete box beam or girders - multiple carrying SR 1005(OLD Pa 36) over Yellow Creek Relief Chan in Bedford County, Pennsylvania. It was built in 1997 and reconstructed in 2012, so it is 28 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 624 vehicles a day, roughly 11% of them trucks, projected to reach 948 by 2032. The structure is 107 ft (32.6 m) long and 37 ft wide. If it were closed, the detour would be 26.1 mi (42 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 1005(OLD Pa 36) over Yellow Creek Relief Chan built?
It was built in 1997, making it 28 years old in 2025. It was reconstructed in 2012.
What condition is SR 1005(OLD Pa 36) over Yellow Creek Relief Chan in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does SR 1005(OLD Pa 36) over Yellow Creek Relief Chan carry?
About 624 vehicles per day (2023 count), of which roughly 11% are trucks.
How long is SR 1005(OLD Pa 36) over Yellow Creek Relief Chan?
The structure is 107 ft (32.6 m) long with a longest span of 105 ft (32 m) and a deck 37 ft wide.
Who owns SR 1005(OLD Pa 36) over Yellow Creek Relief Chan?
It is owned by the State Highway Agency.