US Bridges

Hoenig RD over Br.N.Fork Big Sewickley

Good

Beaver County, Pennsylvania · 0.5 Mi.N.E.Of Lr 04060 · Structure no. 000000000003676

Built
1951
74 years old
Condition
Good
inspected August 2023
Type
Slab
Concrete
Length
22 ft
1 main span
Daily traffic
327
2024 count
Owner
State
State Highway Agency

About this bridge

Hoenig RD over Br.N.Fork Big Sewickley is a concrete slab carrying Hoenig RD over Br.N.Fork Big Sewickley in Beaver County, Pennsylvania. It was built in 1951, so it is 74 years old, older than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 327 vehicles a day, roughly 12% of them trucks, projected to reach 507 by 2032. The structure is 22 ft (6.7 m) long and 28 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesHoenig RD
CrossesBr.N.Fork Big Sewickley
Location0.5 Mi.N.E.Of Lr 04060
RouteState Highway 0
Coordinates40.63366, -80.18165
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating86 US tons
Inventory rating52 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length22 ft (6.7 m)
Longest span18 ft (5.5 m)
Deck width28 ft (8.5 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic327 (2024)
Projected traffic507 by 2032
Trucks12%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Hoenig RD over Br.N.Fork Big Sewickley built?

It was built in 1951, making it 74 years old in 2025.

What condition is Hoenig RD over Br.N.Fork Big Sewickley in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Hoenig RD over Br.N.Fork Big Sewickley carry?

About 327 vehicles per day (2024 count), of which roughly 12% are trucks.

How long is Hoenig RD over Br.N.Fork Big Sewickley?

The structure is 22 ft (6.7 m) long with a longest span of 18 ft (5.5 m) and a deck 28 ft wide.

Who owns Hoenig RD over Br.N.Fork Big Sewickley?

It is owned by the State Highway Agency.