SR 0068 over Sugar Creek
GoodArmstrong County, Pennsylvania · 1 MI W SR 4002 Intersect. · Structure no. 000000000048873
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected January 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 94 ft
- 1 main span
- Daily traffic
- 2,617
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 0068 over Sugar Creek is a prestressed concrete stringer/multi-beam or girder carrying SR 0068 over Sugar Creek in Armstrong County, Pennsylvania. It was built in 2014, so it is 11 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,617 vehicles a day, roughly 12% of them trucks, projected to reach 3,684 by 2032. The structure is 94 ft (28.7 m) long and 33 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 0068 over Sugar Creek built?
It was built in 2014, making it 11 years old in 2025.
What condition is SR 0068 over Sugar Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.
How much traffic does SR 0068 over Sugar Creek carry?
About 2,617 vehicles per day (2023 count), of which roughly 12% are trucks.
How long is SR 0068 over Sugar Creek?
The structure is 94 ft (28.7 m) long with a longest span of 90 ft (27.4 m) and a deck 33 ft wide.
Who owns SR 0068 over Sugar Creek?
It is owned by the State Highway Agency.