T-531 Sotos Road over Glade Run
FairPosted for loadArmstrong County, Pennsylvania · 1 Mile East of SR3007 · Structure no. 000000000003368
- Built
- 1992
- 33 years old
- Condition
- Fair
- inspected May 2023
- Type
- Slab
- Wood or Timber
- Length
- 33 ft
- 1 main span
- Daily traffic
- 50
- 2006 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
T-531 Sotos Road over Glade Run is a wood or timber slab carrying T-531 Sotos Road over Glade Run in Armstrong County, Pennsylvania. It was built in 1992, so it is 33 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 50 vehicles a day, roughly 9% of them trucks, projected to reach 70 by 2026. The structure is 33 ft (10.1 m) long and 20 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was T-531 Sotos Road over Glade Run built?
It was built in 1992, making it 33 years old in 2025.
What condition is T-531 Sotos Road over Glade Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does T-531 Sotos Road over Glade Run carry?
About 50 vehicles per day (2006 count), of which roughly 9% are trucks.
How long is T-531 Sotos Road over Glade Run?
The structure is 33 ft (10.1 m) long with a longest span of 32 ft (9.8 m) and a deck 20 ft wide.
Who owns T-531 Sotos Road over Glade Run?
It is owned by the Town or Township Highway Agency.