First Street over SR 65 N-S RR
GoodAllegheny County, Pennsylvania · Mike Maruca Memorial Br · Structure no. 000000000044333
- Built
- 2007
- 18 years old
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 278 ft
- 2 main spans
- Daily traffic
- 4,500
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
First Street over SR 65 N-S RR is a steel continuous stringer/multi-beam or girder carrying First Street over SR 65 N-S RR in Allegheny County, Pennsylvania. It was built in 2007, so it is 18 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,500 vehicles a day, roughly 25% of them trucks, projected to reach 5,000 by 2041. The structure is 278 ft (84.7 m) long and 45 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was First Street over SR 65 N-S RR built?
It was built in 2007, making it 18 years old in 2025.
What condition is First Street over SR 65 N-S RR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does First Street over SR 65 N-S RR carry?
About 4,500 vehicles per day (2019 count), of which roughly 25% are trucks.
How long is First Street over SR 65 N-S RR?
The structure is 278 ft (84.7 m) long with a longest span of 155 ft (47.2 m) and a deck 45 ft wide.
Who owns First Street over SR 65 N-S RR?
It is owned by the City or Municipal Highway Agency.