Ramp D over 4th Ave Parking Lot
FairAllegheny County, Pennsylvania · Tarentum Bridge · Structure no. 000000000002901
- Built
- 1952
- 73 years old, rebuilt 1986
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 307 ft
- 4 main spans
- Daily traffic
- 1,499
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Ramp D over 4th Ave Parking Lot is a steel stringer/multi-beam or girder carrying Ramp D over 4th Ave Parking Lot in Allegheny County, Pennsylvania. It was built in 1952 and reconstructed in 1986, so it is 73 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,499 vehicles a day, roughly 7% of them trucks, projected to reach 6,862 by 2032. The structure is 307 ft (93.6 m) long and 22 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ramp D over 4th Ave Parking Lot built?
It was built in 1952, making it 73 years old in 2025. It was reconstructed in 1986.
What condition is Ramp D over 4th Ave Parking Lot in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Ramp D over 4th Ave Parking Lot carry?
About 1,499 vehicles per day (2024 count), of which roughly 7% are trucks.
How long is Ramp D over 4th Ave Parking Lot?
The structure is 307 ft (93.6 m) long with a longest span of 82 ft (25 m) and a deck 22 ft wide.
Who owns Ramp D over 4th Ave Parking Lot?
It is owned by the State Highway Agency.