US Bridges

Ramp a over Ramp C D-Rp. NB to Carso

Good

Allegheny County, Pennsylvania · Homestead Interchange · Structure no. 000000000002872

Built
1966
59 years old, rebuilt 2017
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
323 ft
5 main spans
Daily traffic
5,566
2024 count
Owner
State
State Highway Agency

About this bridge

Ramp a over Ramp C D-Rp. NB to Carso is a steel stringer/multi-beam or girder carrying Ramp a over Ramp C D-Rp. NB to Carso in Allegheny County, Pennsylvania. It was built in 1966 and reconstructed in 2017, so it is 59 years old, older than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,566 vehicles a day, roughly 7% of them trucks, projected to reach 11,584 by 2032. The structure is 323 ft (98.5 m) long and 34 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesRamp a
CrossesRamp C D-Rp. NB to Carso
LocationHomestead Interchange
RouteState Highway 0
Coordinates40.39326, -79.93543
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating53.2 US tons
Inventory rating41.1 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans5
Design loadHL 93
Structure length323 ft (98.5 m)
Longest span82 ft (25 m)
Deck width34 ft (10.3 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deck18 ft (5.6 m)

Traffic and service

Average daily traffic5,566 (2024)
Projected traffic11,584 by 2032
Trucks7%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$1.2 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp a over Ramp C D-Rp. NB to Carso built?

It was built in 1966, making it 59 years old in 2025. It was reconstructed in 2017.

What condition is Ramp a over Ramp C D-Rp. NB to Carso in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Ramp a over Ramp C D-Rp. NB to Carso carry?

About 5,566 vehicles per day (2024 count), of which roughly 7% are trucks.

How long is Ramp a over Ramp C D-Rp. NB to Carso?

The structure is 323 ft (98.5 m) long with a longest span of 82 ft (25 m) and a deck 34 ft wide.

Who owns Ramp a over Ramp C D-Rp. NB to Carso?

It is owned by the State Highway Agency.