Grant Avenue over Girtys Run
FairAllegheny County, Pennsylvania · Int. Grant Ave E Ohio ST · Structure no. 000000000002626
- Built
- 1914
- 111 years old, rebuilt 1992
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 30 ft
- 1 main span
- Daily traffic
- 4,500
- 2005 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Grant Avenue over Girtys Run is a steel stringer/multi-beam or girder carrying Grant Avenue over Girtys Run in Allegheny County, Pennsylvania. It was built in 1914 and reconstructed in 1992, so it is 111 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,500 vehicles a day, roughly 6% of them trucks, projected to reach 4,950 by 2030. The structure is 30 ft (9.1 m) long and 51 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Grant Avenue over Girtys Run built?
It was built in 1914, making it 111 years old in 2025. It was reconstructed in 1992.
What condition is Grant Avenue over Girtys Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Grant Avenue over Girtys Run carry?
About 4,500 vehicles per day (2005 count), of which roughly 6% are trucks.
How long is Grant Avenue over Girtys Run?
The structure is 30 ft (9.1 m) long with a longest span of 28 ft (8.5 m) and a deck 51 ft wide.
Who owns Grant Avenue over Girtys Run?
It is owned by the City or Municipal Highway Agency.