Greeley Avenue over Little Pine Creek West
FairPosted for loadAllegheny County, Pennsylvania · 430001 Greeley Ave Bridge · Structure no. 000000000002586
- Built
- 1985
- 40 years old, rebuilt 2019
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 39 ft
- 1 main span
- Daily traffic
- 250
- 2018 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Greeley Avenue over Little Pine Creek West is a steel stringer/multi-beam or girder carrying Greeley Avenue over Little Pine Creek West in Allegheny County, Pennsylvania. It was built in 1985 and reconstructed in 2019, so it is 40 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 250 vehicles a day, roughly 5% of them trucks, projected to reach 275 by 2039. The structure is 39 ft (11.9 m) long and 20 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Greeley Avenue over Little Pine Creek West built?
It was built in 1985, making it 40 years old in 2025. It was reconstructed in 2019.
What condition is Greeley Avenue over Little Pine Creek West in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Greeley Avenue over Little Pine Creek West carry?
About 250 vehicles per day (2018 count), of which roughly 5% are trucks.
How long is Greeley Avenue over Little Pine Creek West?
The structure is 39 ft (11.9 m) long with a longest span of 36 ft (11 m) and a deck 20 ft wide.
Who owns Greeley Avenue over Little Pine Creek West?
It is owned by the City or Municipal Highway Agency.