US Bridges

Ramp Ep-E RD over Ramp Dp-E Baggage Brdgs

Good

Allegheny County, Pennsylvania · OPA107 APO1 Airport 5-1 · Structure no. 000000000002260

Built
1992
33 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
1,366 ft
9 main spans
Daily traffic
4,601
2002 count
Owner
Local
Other Local Agency

About this bridge

Ramp Ep-E RD over Ramp Dp-E Baggage Brdgs is a steel continuous stringer/multi-beam or girder carrying Ramp Ep-E RD over Ramp Dp-E Baggage Brdgs in Allegheny County, Pennsylvania. It was built in 1992, so it is 33 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,601 vehicles a day, roughly 6% of them trucks, projected to reach 4,601 by 2019. The structure is 1,366 ft (416.4 m) long and 37 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRamp Ep-E RD
CrossesRamp Dp-E Baggage Brdgs
LocationOPA107 APO1 Airport 5-1
Coordinates40.4967, -80.2567
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71 US tons
Inventory rating42 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans9 (+6 approach)
Design loadHS 25 or greater
Structure length1,366 ft (416.4 m)
Longest span140 ft (42.7 m)
Deck width37 ft (11.4 m)
Roadway width28 ft (8.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,601 (2002)
Projected traffic4,601 by 2019
Trucks6%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp Ep-E RD over Ramp Dp-E Baggage Brdgs built?

It was built in 1992, making it 33 years old in 2025.

What condition is Ramp Ep-E RD over Ramp Dp-E Baggage Brdgs in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Ramp Ep-E RD over Ramp Dp-E Baggage Brdgs carry?

About 4,601 vehicles per day (2002 count), of which roughly 6% are trucks.

How long is Ramp Ep-E RD over Ramp Dp-E Baggage Brdgs?

The structure is 1,366 ft (416.4 m) long with a longest span of 140 ft (42.7 m) and a deck 37 ft wide.

Who owns Ramp Ep-E RD over Ramp Dp-E Baggage Brdgs?

It is owned by the Other Local Agency.