Birmingham Brg Apr over Pkwy E Rp T Trail 2nd Av
FairAllegheny County, Pennsylvania · Birmingham Bridge · Structure no. 000000000001642
- Built
- 1976
- 49 years old, rebuilt 2016
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 1,082 ft
- 7 main spans
- Daily traffic
- 25,692
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Birmingham Brg Apr over Pkwy E Rp T Trail 2nd Av is a steel continuous stringer/multi-beam or girder carrying Birmingham Brg Apr over Pkwy E Rp T Trail 2nd Av in Allegheny County, Pennsylvania. It was built in 1976 and reconstructed in 2016, so it is 49 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 25,692 vehicles a day, roughly 6% of them trucks, projected to reach 26,062 by 2032. The structure is 1,082 ft (329.8 m) long and 81 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Birmingham Brg Apr over Pkwy E Rp T Trail 2nd Av built?
It was built in 1976, making it 49 years old in 2025. It was reconstructed in 2016.
What condition is Birmingham Brg Apr over Pkwy E Rp T Trail 2nd Av in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does Birmingham Brg Apr over Pkwy E Rp T Trail 2nd Av carry?
About 25,692 vehicles per day (2024 count), of which roughly 6% are trucks.
How long is Birmingham Brg Apr over Pkwy E Rp T Trail 2nd Av?
The structure is 1,082 ft (329.8 m) long with a longest span of 186 ft (56.7 m) and a deck 81 ft wide.
Who owns Birmingham Brg Apr over Pkwy E Rp T Trail 2nd Av?
It is owned by the State Highway Agency.