Parkway East over Second Ave
FairAllegheny County, Pennsylvania · EB over Second Avenue · Structure no. 000000000001137
- Built
- 1953
- 72 years old, rebuilt 1984
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 763 ft
- 3 main spans
- Daily traffic
- 41,597
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Parkway East over Second Ave is a steel stringer/multi-beam or girder carrying Parkway East over Second Ave in Allegheny County, Pennsylvania. It was built in 1953 and reconstructed in 1984, so it is 72 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 41,597 vehicles a day, roughly 5% of them trucks, projected to reach 16,601 by 2032. The structure is 763 ft (232.6 m) long and 47 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Parkway East over Second Ave built?
It was built in 1953, making it 72 years old in 2025. It was reconstructed in 1984.
What condition is Parkway East over Second Ave in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Parkway East over Second Ave carry?
About 41,597 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is Parkway East over Second Ave?
The structure is 763 ft (232.6 m) long with a longest span of 120 ft (36.6 m) and a deck 47 ft wide.
Who owns Parkway East over Second Ave?
It is owned by the State Highway Agency.