Raymond Shafer Hw over SR 4051 Mingo RD
FairAllegheny County, Pennsylvania · Just N of Wexford Interch · Structure no. 000000000000913
- Built
- 1972
- 53 years old, rebuilt 2011
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 184 ft
- 3 main spans
- Daily traffic
- 43,229
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Raymond Shafer Hw over SR 4051 Mingo RD is a prestressed concrete stringer/multi-beam or girder carrying Raymond Shafer Hw over SR 4051 Mingo RD in Allegheny County, Pennsylvania. It was built in 1972 and reconstructed in 2011, so it is 53 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 43,229 vehicles a day, roughly 8% of them trucks, projected to reach 27,084 by 2032. The structure is 184 ft (56.1 m) long and 56 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Raymond Shafer Hw over SR 4051 Mingo RD built?
It was built in 1972, making it 53 years old in 2025. It was reconstructed in 2011.
What condition is Raymond Shafer Hw over SR 4051 Mingo RD in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Raymond Shafer Hw over SR 4051 Mingo RD carry?
About 43,229 vehicles per day (2024 count), of which roughly 8% are trucks.
How long is Raymond Shafer Hw over SR 4051 Mingo RD?
The structure is 184 ft (56.1 m) long with a longest span of 73 ft (22.3 m) and a deck 56 ft wide.
Who owns Raymond Shafer Hw over SR 4051 Mingo RD?
It is owned by the State Highway Agency.