SR 0065 NB over SR 65 SB Various ST Ally
FairAllegheny County, Pennsylvania · Fort Duquesne Bridge · Structure no. 000000000000801
- Built
- 1968
- 57 years old, rebuilt 1988
- Condition
- Fair
- inspected March 2024
- Type
- Box Beam or Girders - Multiple
- Steel Continuous
- Length
- 1,293 ft
- 13 main spans
- Daily traffic
- 25,881
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
SR 0065 NB over SR 65 SB Various ST Ally is a steel continuous box beam or girders - multiple carrying SR 0065 NB over SR 65 SB Various ST Ally in Allegheny County, Pennsylvania. It was built in 1968 and reconstructed in 1988, so it is 57 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 25,881 vehicles a day, roughly 7% of them trucks, projected to reach 21,872 by 2032. The structure is 1,293 ft (394.1 m) long and 36 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 0065 NB over SR 65 SB Various ST Ally built?
It was built in 1968, making it 57 years old in 2025. It was reconstructed in 1988.
What condition is SR 0065 NB over SR 65 SB Various ST Ally in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does SR 0065 NB over SR 65 SB Various ST Ally carry?
About 25,881 vehicles per day (2024 count), of which roughly 7% are trucks.
How long is SR 0065 NB over SR 65 SB Various ST Ally?
The structure is 1,293 ft (394.1 m) long with a longest span of 107 ft (32.6 m) and a deck 36 ft wide.
Who owns SR 0065 NB over SR 65 SB Various ST Ally?
It is owned by the State Highway Agency.